Exportar este item: EndNote BibTex

Use este identificador para citar ou linkar para este item: http://bibliotecatede.uninove.br/handle/tede/1703
Registro completo de metadados
Campo DCValorIdioma
dc.creatorBarakat, Májida Farid-
dc.creator.Latteshttp://lattes.cnpq.br/8868794635240284por
dc.contributor.advisor1Berssaneti, Fernando Tobal-
dc.contributor.referee1Berssaneti, Fernando Tobal-
dc.contributor.referee2Santana, José Carlos Curvelo-
dc.contributor.referee3Fleury, André Leme-
dc.date.accessioned2017-08-04T21:37:42Z-
dc.date.issued2017-03-07-
dc.identifier.citationBarakat, Májida Farid. Gerenciamento de risco em um projeto de transferência de tecnologia intracompanhia farmacêutica. 2017. 96 f. Dissertação( Programa de Mestrado em Engenharia de Produção) - Universidade Nove de Julho, São Paulo.por
dc.identifier.urihttp://bibliotecatede.uninove.br/handle/tede/1703-
dc.description.resumoEste trabalho trata de um estudo de caso quantitativo e qualitativo dirigido para a análise crítica da contribuição do gerenciamento de riscos em projetos de transferência de tecnologia intracompanhia farmacêutica. Foi considerado um projeto de alteração do local de fabricação, embalagem e controle de qualidade de um medicamento sólido oral realizado em nível regional, entre plantas localizadas em diferentes municípios do estado de São Paulo para atender a estratégia comercial de uma companhia multinacional farmacêutica. Este projeto teve início em 2013, incluindo planejamento, organização e execução com previsão de conclusão em 2015. Foi realizada análise qualitativa dos riscos relacionados aos atendimentos de escopo e requisitos da qualidade do projeto e também análise quantitativa dos riscos relacionados ao cumprimento do prazo do projeto. Para confirmar ou refutar as seis proposições de pesquisa apresentadas, foram realizadas entrevistas semiestruturadas e observação direta na unidade de análise, revisão bibliográfica e análise de dados. Os resultados mostram que após análise qualitativa dos riscos do projeto relacionados aos atendimentos de escopo e requisitos da qualidade utilizando a ferramenta Análise de Modo de Falha e seus Efeitos - FMEA, foram identificados 39 modos de falha, com valores de Número de Prioridade de Risco - NPR variando de 70 a 288, sendo os de maior severidade e, portanto, prioridade os referentes aos requisitos da qualidade quanto a regulamentação sanitária. Indicam, também, que a partir da Simulação de Monte Carlo o prazo máximo esperado para o projeto é de 1841 dias e o mínimo de 1473 dias. A conclusão da pesquisa mostra que as proposições não se confirmam de forma plena. Foi proposto um plano de ação objetivando a mitigação dos riscos analisados.por
dc.description.abstractThis research deals with a quantitative and qualitative case study aimed at the critical analysis of the contribution of risk management in projects of pharmaceutical intracompany technology transfer. It was considered a project to change the location of manufacturing, packaging and quality control of a solid oral medicine performed at a regional level, between sites located in different municipalities of the state of São Paulo to meet the commercial strategy of a multinational pharmaceutical company. This project began in 2013, including planning, organization and execution with completion expected in 2015. A qualitative assessment of the risks related to the scope and quality requirements of the project was performed, as well as a quantitative assessment of the risks related to compliance with the project deadline. In order to confirm or refute the six research propositions presented, it was conducted semi-structured interviews and direct observation in the unit of analysis, bibliographic review and data analysis. The results show that after qualitative analysis of the project risks related to the scope and quality requirements using the Failure Mode and Effect Analysis - FMEA tool, 39 failure modes were identified, with Priority Risk Number - PRN values varying from 70 to 288, the failure modes of greater severity and therefore, priority, it was the quality requirement for health regulations. They also indicate that from the Monte Carlo Simulation the maximum expected time for the project is 1841 days and the minimum of 1473 days. The conclusion of the research shows that the propositions are not fully confirmed. An action plan was proposed to mitigate the risks analyzed.eng
dc.description.provenanceSubmitted by Nadir Basilio (nadirsb@uninove.br) on 2017-08-04T21:37:42Z No. of bitstreams: 1 Majida Farid Barakat.pdf: 1578082 bytes, checksum: 0ce4d1fce799ec5caafefd77e0d78c25 (MD5)eng
dc.description.provenanceMade available in DSpace on 2017-08-04T21:37:42Z (GMT). No. of bitstreams: 1 Majida Farid Barakat.pdf: 1578082 bytes, checksum: 0ce4d1fce799ec5caafefd77e0d78c25 (MD5) Previous issue date: 2017-03-07eng
dc.formatapplication/pdf*
dc.languageporpor
dc.publisherUniversidade Nove de Julhopor
dc.publisher.departmentEngenhariapor
dc.publisher.countryBrasilpor
dc.publisher.initialsUNINOVEpor
dc.publisher.programPrograma de Pós-Graduação de Mestrado e Doutorado em Engenharia de Produçãopor
dc.rightsAcesso Abertopor
dc.subjectgerenciamento de projetospor
dc.subjectgerenciamento de riscopor
dc.subjectprojeto de transferência de tecnologiapor
dc.subjectproject managementeng
dc.subjectrisk managementeng
dc.subjecttechnology transfer projecteng
dc.subject.cnpqENGENHARIAS::ENGENHARIA DE PRODUCAOpor
dc.titleGerenciamento de risco em um projeto de transferência de tecnologia intracompanhia farmacêuticapor
dc.title.alternativeRisk management in an intracompany pharmaceutical technology transfer projecteng
dc.typeDissertaçãopor
Aparece nas coleções:Programa de Pós-Graduação de Mestrado e Doutorado em Engenharia de Produção

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
Majida Farid Barakat.pdfMájida Farid Barakat1,54 MBAdobe PDFBaixar/Abrir Pré-Visualizar


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.