Exportar este item: EndNote BibTex

Use este identificador para citar ou linkar para este item: http://bibliotecatede.uninove.br/handle/tede/985
Registro completo de metadados
Campo DCValorIdioma
dc.creatorGirardi, Leandro Ranolfi-
dc.creator.Latteshttp://lattes.cnpq.br/3049303548582671por
dc.contributor.advisor1Rabechini Junior, Roque-
dc.contributor.advisor1Latteshttp://lattes.cnpq.br/1996533325699482por
dc.contributor.referee1Rovai, Riccardo Leonardo-
dc.contributor.referee2Cattini Junior, Orlando-
dc.date.accessioned2015-05-07T18:30:57Z-
dc.date.issued2015-02-12-
dc.identifier.urihttps://bibliotecatede.uninove.br/handle/tede/985-
dc.description.resumoInvestimentos em projetos de infraestrutura são estratégicos para o desenvolvimento econômico, social e cultural de um país. A estimativa mundial é de investimentos anuais na ordem de US$ 3,4 trilhões até 2030, ou aproximadamente 4% do Produto Interno Bruto (PIB), em projetos de infraestrutura. No Brasil, a taxa de investimento neste tipo de empreendimento atinge a marca de 9,9% do PIB, alcançando índices próximos aos de países desenvolvidos. Em termos de investimento, o país vivencia um momento propício para novos projetos de infraestrutura, principalmente por meio de parcerias público privadas (PPPs), porém quando estes são avaliados pela vertente gerencial, percebe-se que deficiências na forma como eles são administrados, limitam o alcance dos seus objetivos. Estes projetos envolvem vários fatores de riscos e o sucesso na sua implementação depende da efetividade do seu gerenciamento, cujas intervenções vão além do uso de simples técnicas analíticas. Assim, este estudo avalia qual a influência dos fatores de riscos no desempenho dos projetos de infraestrutura. Para tal, utiliza o referencial teórico associado tanto à literatura voltada para o gerenciamento de riscos como também à literatura sobre complexidade e desempenho. A partir do levantamento bibliográfico, foram elaboradas sete proposições de estudo e uma hipótese geral que serviram de base para o desenvolvimento da pesquisa de campo junto a cinco projetos, todos pertencentes a diferentes segmentos econômicos no cenário brasileiro. A metodologia usada previu o desenvolvimento do método de levantamento em complementariedade ao estudo de casos múltiplos, através do qual as informações colhidas nos empreendimentos foram analisadas em conjunto e de forma cruzada, possibilitando a identificação mais robusta dos fatores de riscos e as respectivas influências nas dimensões de desempenho avaliadas. As evidências empíricas sugerem que existem grupos de fatores de riscos que estão associados a projetos com diferentes graus de impacto no desempenho. Observou-se, complementarmente, que a eficiência é alcançada quando a intensidade no gerenciamento dos riscos e o estilo de gestão da complexidade aplicados são compatíveis ao tipo de empreendimento (tipificação). Constatou-se, desta forma, que dependendo do tipo de fator de risco envolvido, a influência gerada por ele pode ter diferentes magnitudes e impactar dimensões de desempenho específicas nos projetos, principalmente se a intensidade no gerenciamento dos riscos for baixa. Ressalta-se, assim, a necessidade de maior preparo dos gerentes, em termos de conhecimento e habilidades, para que o gerenciamento de riscos seja mais eficiente e melhores desempenhos sejam conquistados.por
dc.description.abstractInvestments in infrastructure projects are strategic for the economic, social and cultural development of a country. The world's annual investment estimate in the order of $ 3.4 trillion until 2030, or about 4 percent of gross domestic product (GDP), in infrastructure projects. In Brazil, the rate of investment in this type of venture hits the mark of 9.9 percent of GDP, reaching levels close to those of developed countries. In terms of investment, the country experiences a propitious moment for new infrastructure projects, mainly through public private partnerships (PPPs), however when these are evaluated by the managerial aspect, one realizes that deficiencies in how they are administered, limit the scope of its objectives. These projects involve multiple risk factors and the success in its implementation depends on the effectiveness of its management, whose speeches go beyond using simple analytical techniques. Thus, this study assesses the influence of risk factors on the performance of infrastructure projects. To this end, uses the theoretical reference associated with both the literature focused on the risk management but also to literature on complexity and performance. From the literature, have been prepared seven study of propositions and a general hypothesis that formed the basis for the development of field research in five projects, all belonging to different economic sectors in the Brazilian scenario. The methodology predicted the development of the survey method in complementarity to the study of multiple cases, by which the information gathered in the projects were analyzed together and cross form, enabling more robust identification of risk factors and their influence on dimensions of assessed performance. The empirical evidence suggests that there are groups of risk factors that are associated with projects with varying degrees of impact on performance. It was observed, in addition, that the efficiency is achieved when the intensity in managing the risks and complexity management style applied are compatible to the type of enterprise (typification). It was noted, therefore, that depending on the risk factor involved, the influence generated by it can have different magnitudes and influence specific performance dimensions in the projects, especially if the intensity in the management of risk is low. Stresses therefore the need for greater training of managers, in terms of knowledge and skills, so that risk management is more efficient and better performances are achieved.eng
dc.description.provenanceSubmitted by Nadir Basilio (nadirsb@uninove.br) on 2015-05-07T18:30:57Z No. of bitstreams: 1 Leandro Ranolfi Girardi.pdf: 2924915 bytes, checksum: 05b9c25c3974373dac376031e8e880ef (MD5)eng
dc.description.provenanceMade available in DSpace on 2015-05-07T18:30:57Z (GMT). No. of bitstreams: 1 Leandro Ranolfi Girardi.pdf: 2924915 bytes, checksum: 05b9c25c3974373dac376031e8e880ef (MD5) Previous issue date: 2015-02-12eng
dc.formatapplication/pdf*
dc.languageporpor
dc.publisherUniversidade Nove de Julhopor
dc.publisher.departmentAdministraçãopor
dc.publisher.countryBrasilpor
dc.publisher.initialsUninovepor
dc.publisher.programPrograma de Pós-Graduação em Gestão de Projetospor
dc.rightsAcesso Abertopor
dc.subjectprojeto de infraestruturapor
dc.subjectdesempenhopor
dc.subjectgerenciamento de riscopor
dc.subjectfator de riscopor
dc.subjectcomplexidadepor
dc.subjectinfrastructure projecteng
dc.subjectperformanceeng
dc.subjectrisk managementeng
dc.subjectrisk factoreng
dc.subjectcomplexityeng
dc.subject.cnpqCIENCIAS SOCIAIS APLICADAS::ADMINISTRACAOpor
dc.titleInfluência dos fatores de riscos no gerenciamento dos projetos de infraestruturapor
dc.title.alternativeInfluence of risk factors in the management of the infrastructure projectseng
dc.typeDissertaçãopor
Aparece nas coleções:Programa de Pós-Graduação em Gestão de Projetos

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
Leandro Ranolfi Girardi.pdfLeandro Ranolfi Girardi2,86 MBAdobe PDFBaixar/Abrir Pré-Visualizar


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.